Skip to content

Contact our team

Give us a call
Water

Two basins (54 x 174 m) were constructed at the new Schenkeveld building

Tholen – Two basins were installed at Schenkeveld’s new construction.

Each basin is 54×174 meters. Albers Alligator installed the foil on behalf of van Daalen GWW. That always requires a lot of manpower. Schenkeveld had gathered the people to pull the foil in. That job is always done quickly. Albers Alligator then mounted the foil. That went smoothly at Schenkeveld: two days.

Our projects

Back to other projects

Horticulture

Floating solar energy at Royal Peppers

Water
Horticulture

Large foil basin with Multi-F covering

Water
Industry

Sustainable & Reliable Drinking 

Water
Horticulture

Water silos with Alligator silo lining 

Water
Industry

Floating screen in aeration tank

Water
Horticulture

10 SiloDomes at Schiphol

Water

Contact our team

Need more info? Get in touch.

Get in touch Get in touch

Working with a solution from Albers Alligator means you can rely on the core promise we’ve been committed to since 1901.